COMMERCIAL PROJECTS
Below are a few of our completed commercial projects

Project involved
2000m2 large format porcelain tiling to luxury private spa and pool area
2x luxury marble receptions -200m2 honed pietra grey 1200x1200 floroing, feature wall, polished arabescato marble desks, bespoke made letter boxes, 8 lift carts manufactured and installed in pietra grey marble

Project involved
700m2 purbeck stone installed to church flooring on a lime mortar

Project involved
800m2 of granite flooring throughout ground floor reception, bespoke patterns designed and manufactured

Project involved
700m2 of client supplied marble, Janatti undertook manufacture of bespoke made borders and circular flooring
​

Project involved
100m2 of granite flooring throughout ground floor reception,
Salome marble manufactured into fireplace and lift surrounds (floors 1-9) and corridor portalsÂ
Granite vanity tops, shelves, thresholds and soap dish holders manufactured and installed to all hotel rooms

Project involved
2x new marble walls manufactured and installed to match existing in restaurant area.
Black granite manufactured and installed to bar tops
22 x Verdi jade columns manufactured and installed to ballroom to match existing
entrance foyer and reception flooring repaired and re-polsihed back to former beauty
existing walls throughout ground floor restored to former beauty

Project involved
300m2 of 30mm thick limestone cladding to internal and external walls
black granite manufactured for stallrisers, steps and paving
70m2 porcelain tiling to reception flooring and matching staircase

Project involved
800m2 of bookmatched statuary wall cladding throughout lounge
2x reception desks and 4 x serving counters manufactured in matching materials
300m2 bespoke resin filled pebble marble tiles to shower feature walls

Project involved
400m2 of bespoke cut marble to match existing with matching steps and risers. bespoke cut pattern to top floor area

Project involved
1000m2 of 1400x800 resin filled tarvertine to flooring
220m2 of 30mm flame textured wall cladding
50m2 of glass,porcelain and metal mosaics to feature wallÂ
3 staircases manufactured in resin filled travertine

OUR LADY OF THE CRAYS RC CHURCH
ORPINGTON
Project involved
500m2 of classico travertine and noche travertine to church flooring and matching steps
bespoke made stainless angle brackets for pews undertaken

DORCHESTER HOTEL ROOF TOP SUITES
Project involved
6 luxury bathrooms manufactured and installed with all waterprrofing undertaken
200m2 lightweight resin Terrazzo and metalwork installed to external cladding
90lm of 120mm thick terrazzo coppings installed to roof

DORCHESTER HOTEL CRYSTAL SUITE
Project involved
200m2 botticino 1mx1m marble flooring installed and polished on completion for a completely flush finish
bespoke made staircase in matching material
4 x marble tiling to bathrooms with matching vanity units

Project involved
80m2 island stone wall cladding throughout reception
600m2 honed granite paving to reception floor and  Atrium
200m2 porcelain tiling to toilet cores

BUCKINGHAM PALACE ROAD
Project involved
400m2 Jerusalem gold marble tiling to toilet walls and floor cores
Granite vanity tops and urinal dividers manufactured and installed

Project involved
120m2 Jura limestone installed to reception flooring extension. Existing flooring re-polished back to former glory

Project involved
60m2 bespoke made 150mm thick polished granite manufactured and installed with structural metalwork to external fascade to Zegna store in bond street

Project involved
120m2 bespoke cut granite to flooring installed throughout ground floor

Project involved
200m2 1200x600 porcelain tiles to toilet core flooring
80m2 450x450 porcelain tiles to sink area flooring
100m2 glass tiles to sink walls
100m2 porcelain mosaics to cubicle walls

Project involved
80m2 limestone flooring to bar area and walkways
200m2 limestone cladding to walls and capping's
10m2 limestone bar and capping's manufactured and installed
​

TOTTENHAM COURT ROAD
Project involved
40m2 Italian green slate cladding to external fascade
100m2 of porcelain tiling tiling to toilet cores and entrance foyer

Project involved
380m2 purbeck stone installed to church flooring on lime mortar .
​

Project involved
600m2 of granite flooring installed ground floor and levels 1-10 lift lobbys.
3x reception counters manufacture in matching material

Project involved
Refurbishment of existing lobby walls
New flooring installed to match existing
New walls , skirting and dado installed to match existing
New black slate to match existing installed to door frames, skirting and borders

Project involved
600m2 of precast Terrazzo installed to new restaurant flooring with matching skirting. Flooring panels were 1600x1000x30mm thick

Project involved
600m2 porcelain floor tiling throughout reception area.
New verde jade lift surrounds manufactured to ground floor lifts
100m2 textured porcelain wall tiling to lift lobby walls
Existing structural stonework carefully removed and re-manufactured for new walls in reception, new stones supplied to match existing stonework to columns
​

Project involved
600m2 of 50mm thick yorkstone paving throughout new visitor centre
Bespoke hand craft feature panel to center flooring piece

Project involved
100m2 quartz flooring manufacture and installed
staircase and matching wall caldding and handrails in matching materials
​

TRINITY SCHOOL -CROYDON
Project involved
200M2- 40mm thick limestone cladding manufactured and installedÂ
metalwork and insulation undertaken

Project involved
100m2 Limestone flooring installed throughout ground floor reception and toilet cores

Project Inolved
Porcelain tiling throughout building

Project involved
400m2 granite paving installed on pedestals